Status: Success

Operation

Radiation Control

Mission Objectives

try not to suffer radiation poisoning

Mission Summary

More pilots showed up for duty than expected considering the radiationn but it was not too scary so we headed out to make the best of it. Scarecrow constructed a new tall bike, TallPox, an outstanding design that withstood a thumbtack to the rear thruster. DangerMouse navigated for her first time and did wonderfully taking the group through Cambridge system over the Longfellow bridge and into the Boston system. She had her sights set on what is know to earth life forms as "public alley 420" and after initial obstructions the group was moved through this difficult space way. Smasher took over tailgunning half way through the mission and rocked the tail, as we say on the wet, slippery space ways of the Boston system, he is also hot like a blowtorch, posi posi. In the Centeral constilation we encountered some food who were impressed by our evolved technology. No Derby action, maybe next week.
Pilot Ship Points Promotion
Asher Summer 193.545  
Danger Mouse Spooky Pirate 224.805   Rear Admiral, Upper Half
Glyptodont War 470.728   Lieutenant Junior Grade
grendel Devastation 2108.43   Vice Admiral
Inari Anger 105.157   Aviator First Class
LoJack Skylab 164.681  
MoneyShot Delirium 115.025  
moose Loki Ducker 184.74  
Pikachu Mjollnir 1036.47   Captain
Rotwang Trez Bonz 117.36  
Scarecrow Tallpox 194.366  
Skunk Catastrophe 871.872  
Smasher Ez Raider 922.653   Rear Admiral, Upper Half
Snaggletooth Pestilence 107.012   Senior Chief Petty Officer
Twist Greed 152.876   Petty Officer Second Class
Twisted Mike Pale Horse 71.3881   Aviator
Vegetable Bonnie & Clyde 266.868   Commander
vomit Jan Brady 81.8433  
Pilots must be logged in to see the briefing.
Taskforce Pilot
Mission Leader Skunk
Navigator Danger Mouse
Tailgunner Smasher
Tool Bag Smasher
Medi Bag moose
Life Support 1 Skunk
Filmer grendel

Mission Parameters

DivisionMAD
Date2002.10.12
Mission LeaderSkunk
Mission Size 18 pilots
OriginFort Summer
Destinationwetness
Light Years9.550
G-Well Activity1.119
Technical Rating1.204